This project included a new four-story 114,000 SQ FT hospital wing addition. The first level is used for parking with hospital space on the floors above. The design included an owner option for future vertical expansion.
The design included gravity steel framing, moment frame lateral system, and foundation system.
Provided structural engineering support during the construction phase portion of the project including reviewing shop drawings and responding to challenging RFIs.